Právě se nacházíte: home page » About The Green Savings programme » About the List of Products and Technologies (LPT) » Certificates for LPT registration

Certificates for LPT registration

The certificates needed for registration in the List of Products and Technologies are specified in the statement of the Association of Testing Laboratories for Construction on documents needed for product groups registered in the List of Products and Technologies (LPT) of 29th April 2009, and the statement of the Engineering Test Institute of 2nd June 2009 for biomass-fired boilers.

The designer always determines whether the product is suitable for the specific building.

Terms of reference:

  • Independent body
  • AP - Authorised Person (previously State Testing Laboratory
  • NB - Notified Body (notified in the EU)

At present, the "Osvědčeno pro stavbu" (Certified for Building) product certificate fully guarantees that Czech legislation requirements have been met, not only for putting the product on the market but also in the building.

Unless this certificate is submitted, which will apply to an overwhelming majority of products, the following documents will be required for specific product groups:

1) Windows and doors:

  • Product certificate + certification protocol pursuant to Government Regulation 163 issued by an independent body (AP) + declaration of conformity; or
  • Protocol of product conformity verification issued by an independent body pursuant to GR 163 + declaration of conformity; or
  • Protocol of initial type test issued by a notified body pursuant to GR 190 + declaration of conformity.

2) Industrially made insulation materials
(polystyrene foams, mineral fibres, etc.):

  • Product certificate + certification protocol issued by an AP + declaration of conformity; or
  • EC Certificate of conformity issued by a notified body + declaration of conformity; or
  • Protocol of initial type test issued by an EC notified body + declaration of conformity.

3) Thermal insulation systems:

  • Certificate + certification protocol issued by an AP + declaration of conformity; or
  • EC certificate of conformity or EC certificate of production control system issued by a notified body + EC declaration of conformity, European Technical Approval (ETA).

4) Solar collectors:

  • Certificate + certification protocol issued by an independent body AP + declaration of conformity; or
  • Protocol of conformity verification issued by an independent body AP + declaration of conformity.

5) Heat pumps:

  • Protocol of conformity verification + proof of parameters required by the Programme

6) Biomass-fired boilers

Biomass-fired boilers are subject to the Government Regulation ("GR") No. 163/2002 Coll., as amended, which presents the technical requirements for selected construction products (hereinafter as GR 163/2002 Coll.), where this product type is listed in Annex No. 2, product group No. 10, serial number 6 with the following possible conformity assessment procedures and issued documents:

  • For the prescribed reaction to fire level A11, A21, B1, C1 - procedure according to Section 5a with subsequent issuance of the initial type test protocol (the production control system or the system of product control by the importer are also assessed) and the product certificate. The manufacturer or the importer must issue a written declaration of conformity pursuant to Section 13 of GR No. 163/2002 Coll.

    Certificate validity is conditioned by regular supervision over proper functioning of the production control system at the manufacturer's production site with subsequent issuance of a report by the authorised person at least every 12 months.

    If the importer fails to provide the authorised person with the production control system assessment at the manufacturer, the authorised person shall follow the procedure set out in Section 5. The outputs are the same as those listed in Section 5a, but the authorised person performs supervision over proper functioning of product control at the manufacturer and product sample tests at least every 12 months.

  • For the prescribed reaction to fire level A12, A22, B2, C2, D, E - procedure according to Section 7 with subsequent issuance of the initial type test protocol specifying the validity period.

    The manufacturer or the importer must issue a written declaration of conformity pursuant to Section 13 of GR No. 163/2002 Coll.

  • For the prescribed reaction to fire level (A1 to E3)3, F - procedure of conformance assessment by the manufacturer pursuant to Section 8, the manufacturer must issue a written declaration of conformity pursuant to Section 13 of GR No. 163/2002 Coll.

  • The manufacturer may substitute Sections 7 and 8 for Section 5 (for outputs see point 1).

The procedures mentioned above guarantee that legislation requirements for putting products on the Czech market are met.

 



Aktuality

09.01.2017 170 milionů na energeticky úsporné renovace veřejných budov

MŽP vyhlašuje třetí výzvu k podávání žádostí o dotaci pro budovy veřejného sektoru. Kromě budov sloužících k poskytování služeb zaměřených na zdravotní lázeňskou léčebně rehabilitační péči, pro které byla určena druhá výzva, je ve třetí výzvě možné nově žádat o dotaci i na nevyužívané veřejné budovy, u kterých nelze doložit reálnou spotřebu energie v předchozím období a nelze je proto podpořit v jiných dotačních programech.

11.12.2015 MŽP vyhlašuje druhou výzvu pro budovy veřejného sektoru

Na energeticky úsporné renovace veřejných budov je k dispozici 150 milionů korun. Žádosti o dotace začne Státní fond životního prostředí ČR přijímat 15. prosince 2015 v 10 hod.

23.03.2015 Změna úředních hodin krajských pracovišť

Od dubna budou úřední hodiny na krajských pracovištích SFŽP ČR sjednoceny pro všechny programy. Krajská pracoviště budete moci navštívit v pondělí, ve středu a v pátek.

23.12.2014 Aktualizace Směrnice MŽP č. 9/2009

Dne 22. prosince 2014 ministr životního prostředí Richard Brabec podepsal Dodatek č. 7 ke Směrnici MŽP č. 9/2009.

18.12.2014 Krajské pracoviště v Kladně končí

Krajská pobočka SFŽP ČR v Kladně bude ke dni 30. 12. 2014 zrušena. Žádosti, které administruje, budou převedeny na KP Praha - SFŽP ČR, Olbrachtova 2006/9, 140 00 Praha 4.

15.10.2014 Odstávka informačních systémů SFŽP ČR

Z technických důvodů budou od pátku 17. října od 16 hod do sobotních 17 hod všechny informační systémy SFŽP ČR mimo provoz.

10.09.2014 Ministr prodloužil program Zelená úsporám pro veřejné budovy

Program Zelená úsporám pro budovy veřejného sektoru byl prodloužen až do konce roku 2016.

19.06.2014 Upozornění na omezení služeb informačních systémů SFŽP ČR

Z technických důvodů proběhne ve středu 25. 6. od 17 hodin mimořádná odstávka všech informačních systémů SFŽP ČR a elektronické pošty. Systémy budou částečně zprovozněny ve čtvrtek 26. 6. od 10 hod, k plnému obnovení provozu dojde v 16 hodin.

21.03.2014 Program Zelená úsporám je v cílové rovince

V programu Zelená úsporám již bylo vyplaceno přes 20 miliard korun. Vyzýváme všechny žadatele, kteří mají dokládat realizaci provedených opatření, aby toto doložení neodkládali, ale provedli co nejdříve.

12.11.2013 Dodatek č. 6 ke Směrnici MŽP č. 9/2009

Dne 11. listopadu 2013 byl ministrem životního prostředí Tomášem Janem Podivínským podepsán Dodatek č. 6 ke Směrnici MŽP č. 9/2009. Dodatkem byla prodloužena doba trvání Programu Zelená úsporám a upraveny závazné termíny týkající se administrace žádostí o poskytnutí podpory. Součástí dodatku je také upřesnění některých administrativních procesů a podmínek poskytování podpory.

» Další aktuality >>


Nová zelená úsporám
 


 
NZU 2013


Partneři

Program Ministerstva životního prostředí administrovaný Státním fondem životního prostředí ČR
zaměřený na úspory energie a obnovitelné zdroje energie v rodinných a bytových domech
Oficiální web programu Zelená úsporám